Skip to content
FORMINERSEUROPE
European ASIC & energy infrastructure

Built From Hands-On Mining. Focused On Useful Infrastructure.

ForMiners helps clients buy, host, tune and deploy ASIC miners while connecting electricity, hardware and recoverable heat in one practical project scope.

The company grew from operating mining hardware and sites into a European project desk for managed hosting, containers, custom installations, firmware and useful-energy applications.

Elphapex ASIC miners presented at the team office

Real hardware. Real operating context.

ASIC equipment is part of the team's everyday commercial and technical work.

Owner-provided media
  • Since 2019

    Professional ASIC placement and operations

  • EU company

    Published legal entity, office and direct contacts

  • One project desk

    Hardware, hosting and infrastructure in one scope

  • Since 2019

    Operating in Europe

  • 3,100+

    ASICs in operation

  • 600+

    Clients served

  • Up to 50 MW

    Available capacity

  • EU-based

    Service and operations

Why clients choose ForMiners

Commercial Decisions Backed By Operating Reality

The team treats an ASIC project as infrastructure: equipment, power, cooling, controls, service access and ownership must work together.

ForMiners project team commissioning equipment on site in Lithuania

Field commissioning

Project work continues after the proposal is signed.

Equipment configuration, access, cooling interfaces and operational handover are reviewed in the real site environment.

01

Commercial clarity

Scope before commitment

Hardware, location, availability, responsibilities and commercial assumptions are confirmed in a written proposal before deployment.

02

Technical fit

The site decides the solution

Power, cooling, heat demand, noise, service access and monitoring are reviewed before a miner count or infrastructure route is recommended.

03

Operating reality

Support beyond delivery

ForMiners connects procurement with hosting, commissioning, firmware review, diagnostics and a practical support workflow.

04

Risk-aware

No guaranteed-return language

Mining economics, tuning outcomes and useful heat depend on real operating conditions. Estimates remain transparent and conditional.

Our mission

Mining Infrastructure With More Than One Useful Output

ForMiners develops mining routes that can combine cryptocurrency production, useful heat and better use of available electricity without presenting future results as guaranteed.

Aerial view of a ForMiners containerized ASIC installation and electrical connection

ForMiners infrastructure

Modular capacity designed around power, airflow, monitoring and service access.

Crypto

Mining output

ASIC hardware selected around algorithm, efficiency, power, serviceability and the intended operating environment.

Output path 01

Heat

Useful thermal energy

Heat-reuse concepts for buildings, warehouses, greenhouses and industrial loads where demand and controls support them.

Output path 02

Energy

Flexible electrical load

A controllable use for solar surplus, wind generation or other energy windows that need a productive demand route.

Output path 03

Capabilities

One Project Desk From Hardware To Operation

Clients can engage ForMiners for one stage or combine procurement, deployment and operating support in a coordinated scope.

ForMiners-branded Antminer KA3 prepared on a technical workbench
Coordinated scope

Fewer gaps between the commercial offer and the technical site

ForMiners connects procurement decisions with the location that must power, cool, monitor and service the equipment.

  • ASIC procurement

    Model selection, bulk supply, quote review and delivery route.

  • Managed hosting

    Location fit, intake, monitoring and service scope.

  • On-site infrastructure

    Containers, warehouses and custom electrical or cooling integration.

  • Useful heat projects

    Building, greenhouse and industrial heat-reuse planning.

  • Firmware and diagnostics

    Condition review, efficiency profiles and risk-aware tuning.

  • Ongoing support

    Monitoring, repair coordination and operating escalation paths.

Our path

Experience Built In Stages

The company story is grounded in operating progression: first hardware, then sites, then wider infrastructure partnerships.

Oleg Angelsky speaking at a public event in a ForMiners shirt

Founder and project lead

Oleg Angelsky

Oleg began working in cryptocurrency in 2017. Since 2019, the focus has developed into professional ASIC placement, site operation and international infrastructure partnerships.

  1. 2017

    Stage 1

    The crypto journey begins

    Oleg Angelsky started working in the cryptocurrency sector, building practical experience with hardware, markets and day-to-day mining operations.

    Experience carried into the next stage
  2. 2019

    Stage 2

    Professional ASIC placement

    The work developed into professional miner placement and operation, including the team's own mining sites in Estonia and Latvia.

    Experience carried into the next stage
  3. Today

    Stage 3

    International infrastructure partnerships

    ForMiners now combines hardware, hosting and energy projects across an international partner context that includes the USA, Finland and Bulgaria, with Norway in development.

    Current operating stage

International operating context

Local Project Review, International Capacity Options

ForMiners combines an Estonian operating company and project desk with hosting and infrastructure conversations across several regions. Availability remains location-specific and quote-based.

Online

Cold-climate EU hosting

Finland

Hosting reference

0.099EUR/kWh

5 MW available

Capacity

5 MW available from 25 MW total site capacity.

EU operationsCold climateHigh-density slots
Request Finland slots

Terms confirmed by written quote

Online

High-capacity site

USA

Hosting reference

0.075EUR/kWh

20 MW available

Capacity

Large-capacity intake for hosted ASIC batches and fleet expansion.

Large batchesStable powerRemote monitoring
Request USA slots

Terms confirmed by written quote

Unavailable

Fully occupied EU site

Bulgaria

Hosting reference

0.075EUR/kWh

Fully occupied / 0 MW available

Capacity

Bulgaria has 5 MW fully allocated. New miners can join the intake list for future openings.

EU compliantFully allocatedWaitlist only
Join waitlist

Terms confirmed by written quote

In development

Pending site

Norway

Hosting reference

0.078EUR/kWhexpected

Waiting list

Capacity

Planned cold-climate capacity. Intake is pending final site readiness.

Cold climatePlanned intakePre-registration
Pre-register

Terms confirmed by written quote

Verified company

A Public Company, Office And Project Contact

The legal entity and contact details behind ForMiners are published so clients know who reviews the project and issues the commercial documents.

Legal company

CryptoTech OÜ

Registry 14725379 · VAT EE102373619

Direct contact

+372 5450 3075

info@forminers.eu

Office

Vana-Tartu Maantee 79a, Peetri, 75312 Harju maakond

Peetri, Harju maakond, Estonia

People and operations

A Project Desk Close To The Hardware

ForMiners grew through direct work with mining equipment, client consultations and real operating environments.

ASIC equipment inventory in the ForMiners office

Hardware in the office

Equipment remains part of the team's everyday commercial and technical work.

ASIC hardware being received in an office

Equipment intake

Receiving and checking hardware connects product supply with deployment preparation.

Oleg Angelsky with ASIC miners in the office

Founder-led project work

Oleg Angelsky combines commercial project review with practical mining experience.

Oleg Angelsky working beside ASIC hardware

Close to operations

Client decisions are reviewed against equipment, site and operating constraints.

FAQ

Questions Clients Ask Before Working With ForMiners

Clear answers about experience, services, geography and commercial limits.

How long has the team worked with cryptocurrency and ASIC mining?
Oleg Angelsky's crypto work began in 2017. The team moved into professional ASIC placement and site operation in 2019.
What does ForMiners provide?
ASIC sourcing, managed hosting, containers, custom installations, heat-reuse concepts, service and firmware review depending on location and project requirements.
Where does ForMiners operate?
The operating history includes Estonia and Latvia, while current hosting and partner context includes Finland, the USA and Bulgaria. Norway is presented as capacity in development, not an active confirmed site.
What is the ForMiners mission?
To make mining infrastructure more useful by combining cryptocurrency production with heat reuse or better use of available electricity where the site supports it.
Does ForMiners guarantee mining returns?
No. Mining results depend on market, network, equipment and operating conditions.
Who is the legal company behind ForMiners?
ForMiners is operated by CryptoTech OÜ, an Estonian company with published registry, VAT, office and direct contact details on this website.
Can ForMiners handle only one part of a project?
Yes. A scope can focus on hardware, hosting, firmware, diagnostics or project design, or combine these stages when one coordinated route is more practical.
How does a new project begin?
The first step is a structured review of the objective, available power, site conditions, equipment needs and preferred operating model before a commercial proposal is prepared.