Skip to content
FORMINERSEUROPE
Industrial mining projects

Turn available power into a productive mining asset.

See how ForMiners approaches wind, solar, warehouses, heat reuse, containers and ASIC optimization—from the first site review to commissioned infrastructure.

EU-based deliverySite-specific engineeringCommercial assumptions disclosed
Wind-site installation

Owner-provided field project

Wind-powered ASIC mining integration in Lithuania

Lithuania / EU· Field commissioning

View project

2

Owner-provided field project

5

Site concepts ready to assess

One partner

Equipment to commissioning

Project examples

Find the project model closest to your site

Each example shows the operating problem, proposed infrastructure and decision framework. Field evidence and illustrative planning data are clearly separated.

Generated illustration of a house; not a photograph of this installation.
Completed projectFinland / EU

Illustrative cover, not a photograph of the project.

Residential heat reuse

ASIC heating for a 600 m² home in Finland

An immersion bath sized for six Antminer L9 transfers heat to a boiler serving a 600 m² home. Owner-reported installation facts, without a claim of measured savings.

Energy
Electricity; tariff at installation approximately €0.06/kWh
  • On-site installation work was completed in two days, according to the owner. Design, procurement and the complete commissioning schedule are outside that period.
  • The owner reports an immersion-loop temperature of up to 55°C. This is not a guaranteed tap-water or heating-delivery temperature.
Wind-site installation
Completed projectLithuania / EU

Wind-energy site

Wind-powered ASIC mining integration in Lithuania

Custom generation-tracking software adjusts the power of 3–4 immersion-cooled miners per turbine as available wind energy changes.

Energy
Wind generation and site electricity
  • Brought container, cooling and ASIC equipment into one field deployment workflow.
  • Validated service access and on-site configuration before ongoing operation.
Illustrative ForMiners warehouse mining deployment with ASIC racks and monitored infrastructure
Project conceptEstonia / EU

Warehouse

Warehouse Mining Deployment

Turn available warehouse power and floor space into a monitored ASIC operation with a staged deployment plan.

Capacity
250 kW
Miners
60
Energy
Grid power with available site capacity
  • Created a deployment plan for staged miner installation.
  • Defined monitoring, service and remote visibility requirements.
Illustrative ForMiners solar surplus mining installation with solar panels and modular ASIC infrastructure
Project conceptEU

Solar owner / commercial property

Solar Surplus Mining Project

Compare low-value export with flexible mining and validate the opportunity through a pilot-first model.

Capacity
120 kW
Miners
28
Energy
Solar surplus electricity
  • Defined a conservative export-versus-mining comparison model.
  • Estimated miner count based on surplus power rather than full site capacity.
Illustrative ForMiners greenhouse heat-reuse concept with ASIC infrastructure supplying useful heat
Project conceptNetherlands / EU

Greenhouse

Tulip Greenhouse Heating Concept

Assess mining heat as a controllable input for winter greenhouse demand before investing in scale.

Capacity
180 kW
Miners
42
Energy
Grid power with heat reuse potential
  • Created a heat-first evaluation framework for greenhouse economics.
  • Highlighted humidity, airflow and crop-safety requirements before hardware selection.
Illustrative ForMiners containerized ASIC mining infrastructure with cooling and monitoring
Project conceptEU

Mobile/container mining

Mining Container Deployment

Deploy modular mining capacity faster with infrastructure sized around power, cooling and service access.

Capacity
500 kW
Miners
120
Energy
Grid or excess-energy site connection
  • Estimated maximum miner count from usable power and cooling derating.
  • Mapped container size options for staged deployment.
Illustrative ASIC overclocking and firmware tuning visual focused on efficiency, stability and performance
Project conceptEU

Hosted miners

ASIC Overclocking Optimization

Tune hosted ASICs around efficiency, stability and temperature—not hashrate alone.

Capacity
75 kW
Miners
18
Energy
Hosted facility power
  • Built a before/after comparison format for firmware tuning reviews.
  • Included sample/demo before-after values for hashrate, power and efficiency until measured project data is provided.

How ForMiners delivers

From site inputs to an operating system

A single delivery path keeps power, hardware, cooling, controls and serviceability aligned.

01

Assess the site

We review usable power, tariffs, operating windows, ventilation, heat demand and service access.

02

Build the project model

Hardware, infrastructure and operating assumptions are matched to your site—not a generic calculator.

03

Deploy and support

ForMiners coordinates equipment, commissioning, monitoring and the service workflow after launch.

Evidence before promises

A commercial conversation grounded in your site

Real projects use owner-provided photography and approved facts. Planning cases show how we structure decisions without presenting estimates as guaranteed results.

Have power, heat demand or an underused site?

Send us the location, available kW and operating context. We will identify the practical next step and the information needed for a serious feasibility review.

Start the conversation