Project conceptEUSolar owner / commercial property

Planning example: Solar Surplus Mining Project

This is an illustrative planning scenario, not a completed customer project. The site, equipment and figures are assumptions for discussion, not measured results. Any implementation requires a site assessment and an individual technical proposal.

ForMiners structured a comparison between export value and estimated mining economics, then scoped miner count against available surplus kW and operating hours.

Illustrative ForMiners solar surplus mining installation with solar panels and modular ASIC infrastructure

Country

EU

Energy source

Solar surplus electricity

Deployment

Flexible ASIC load for surplus monetization

Heat reuse

No heat reuse assumed; summer heat rejection and ventilation require separate engineering.

Project frame

Problem and solution

Problem

The site wanted to compare low-value grid export with a controllable mining load during recurring surplus production periods.

Solution

ForMiners structured a comparison between export value and estimated mining economics, then scoped miner count against available surplus kW and operating hours.

Results

What this planning case demonstrates

  • Defined a conservative export-versus-mining comparison model.
  • Estimated miner count based on surplus power rather than full site capacity.
  • Prepared a pilot-first path for validation before scale-up.

Surplus capacity

120 kW

Seed planning value for calculator and layout examples.

Flexible load

28 miners

Illustrative count based on surplus-window planning.

Comparison baseline

Grid export

Mining scenario compared against tariff value.

Deployment data

Equipment and operating assumptions

Equipment

  • ASIC miners matched to surplus windows
  • Power controls
  • Monitoring
  • Optional container concept

Capacity

Capacity
120 kW
Miners
28
Deployment
Flexible ASIC load for surplus monetization

This concept illustrates a possible setup. Figures are calculation inputs, not measured customer results. We assess equipment and economics for your site individually.

Related case studies

More project examples

Illustration of a Nordic lakeside home at dusk
Completed projectFinland / EU

Illustrative cover, not a photograph of the project.

Residential heat reuse

Finland: ASIC heat integration for a 600 m² home

An immersion bath sized for six Antminer L9 transfers heat to a boiler serving a 600 m² home. Owner-reported installation facts, without a claim of measured savings.

Energy
Electricity; tariff at installation approximately €0.06/kWh
  • On-site installation work was completed in two days, according to the owner. Design, procurement and the complete commissioning schedule are outside that period.
  • The owner reports an immersion-loop temperature of up to 55°C. This is not a guaranteed tap-water or heating-delivery temperature.
Containerized mining and cooling equipment installed near wind turbines in Lithuania
Completed projectLithuania / EU

Wind-energy site

Lithuania Wind-Site Mining Integration

Custom generation-tracking software adjusts the power of 3–4 immersion-cooled miners per turbine as available wind energy changes.

Energy
Wind generation and site electricity
  • Brought container, cooling and ASIC equipment into one field deployment workflow.
  • Validated service access and on-site configuration before ongoing operation.
Illustrative ForMiners greenhouse heat-reuse concept with ASIC infrastructure supplying useful heat
Project conceptNetherlands / EU

Greenhouse

Tulip Greenhouse Heating Concept

Assess mining heat as a controllable input for winter greenhouse demand before investing in scale.

Capacity
180 kW
Miners
42
Energy
Grid power with heat reuse potential
  • Created a heat-first evaluation framework for greenhouse economics.
  • Highlighted humidity, airflow and crop-safety requirements before hardware selection.