01
The task
Integrate ASIC heat into the heating system of a 600 m² home in Finland while retaining control of water temperature and a dependable heating supply. Floor area alone does not establish the required heating capacity.
Finland · Completed project
ASIC heat integrated into a 600 m² home in Finland.

Floor area is not a heating load. Bath capacity does not imply continuous operation of six miners.
01
Integrate ASIC heat into the heating system of a 600 m² home in Finland while retaining control of water temperature and a dependable heating supply. Floor area alone does not establish the required heating capacity.
02
An immersion bath sized for six Antminer L9 transfers heat through a fluid circuit to the boiler. The boiler adds heat when required. Bath capacity does not prove that all six miners run continuously.
1:02 · English · No audio
FINLAND / COMPLETED PROJECT Mining heat. Home heating. ASIC heat integrated into a 600 m² home. A real ForMiners installation.
DELIVER. PREPARE. CONNECT. Built around the home’s heating system.
IMMERSION BATH CAPACITY 6 × L9 Antminer equipment. Immersion cooling. The bath is sized for six devices. Capacity does not establish that all six miners run continuously.
REAL INSTALLATION FOOTAGE Capture the heat. Transfer it to the boiler.
HOW HEAT REACHES THE HOME The boiler adds heat when needed. ASIC + immersion Heat enters the fluid Boiler Additional heating as required Home Heat delivered to the building HEAT SOURCE Immersion loop HEATING SIDE Tanks + pipework Explanatory thermal path · not a hydraulic design or a measured performance chart.
REPORTED BY THE PROJECT OWNER 2 days On-site installation work Excludes design, procurement and the full launch schedule. Up to 55°C In the immersion loop Not a guaranteed tap-water or heating-delivery temperature.
YOUR BUILDING, YOUR CONDITIONS Start with the heat demand. The building Heat loss and water temperatures The economics Electricity tariff and usable heat demand Year-round operation Backup heating and summer heat management Useful heat and variable mining revenue are assessed separately.
PLAN A SIMILAR PROJECT Let’s assess your building. Send your heating use, water temperatures and electricity bill. Scan to start a conversation Open chat · send your project details Telegram +372 5450 3075 WhatsApp +372 5323 0723 forminers.eu
600 m² · Finland · Completed project
Immersion bath capacity: 6 × Antminer L9
ASIC equipment heats the immersion fluid; the circuit transfers heat to the boiler, which supplies the building and provides additional heating when needed. This is a thermal sequence, not a hydraulic design. Electrical connection, water temperatures, pumps and safety must be assessed for each building.
From delivery to the heating connection. Photos from the ForMiners project archive.




According to the owner, on-site installation took two days; this excludes design, procurement and the full commissioning schedule. The reported immersion-loop temperature reaches 55°C, not a guaranteed tap-water or heating supply temperature. Real installation photos and video document the work.
Assess heat loss, annual and monthly heating demand, supply/return temperatures and the full electricity bill. Include equipment, installation, pumps, maintenance and pool/firmware fees. Compare useful heat with the existing heating system; evaluate variable mining revenue separately. Plan backup heat, service access, fluid and leak checks, and summer heat rejection or reduced load.
The documented solution retains the boiler for additional heating. Miner output follows the equipment operating state; the building needs heat even during maintenance or shutdown. Heating design should therefore define the backup source, temperature control and operating priorities before selecting miners.
Lower heating demand changes how much recovered heat the building can use. The design must account for reducing miner load or safely rejecting unused heat. Useful heat, electricity consumption and mining income should be recorded separately to evaluate operation across seasons.
Send your heating consumption, water temperatures and electricity bill. We will assess the heating demand and integration requirements before proposing equipment.

View the other project