Planning example: Mining Container Deployment
This is an illustrative planning scenario, not a completed customer project. The site, equipment and figures are assumptions for discussion, not measured results. Any implementation requires a site assessment and an individual technical proposal.
ForMiners prepared a container sizing concept around available power, cooling type, target miner count, service access and monitoring.

Country
EU
Energy source
Grid or excess-energy site connection
Deployment
Containerized ASIC infrastructure
Heat reuse
Heat rejection assumed; heat reuse can be added only after site-specific thermal design.
Project frame
Problem and solution
Problem
The project needed a fast-deployable mining format that could scale without building a permanent mining room first.
Solution
ForMiners prepared a container sizing concept around available power, cooling type, target miner count, service access and monitoring.
Results
What this planning case demonstrates
- Estimated maximum miner count from usable power and cooling derating.
- Mapped container size options for staged deployment.
- Defined assumptions for electrical, airflow and operational review.
Available power
500 kW
Seed planning value for container sizing.
Target count
120 miners
Illustrative capacity before engineering review.
Deployment type
Container
Mobile infrastructure concept for scalable projects.
Deployment data
Equipment and operating assumptions
Equipment
- Mining container
- ASIC fleet
- Ventilation/cooling system
- Electrical distribution
- Monitoring
Capacity
- Capacity
- 500 kW
- Miners
- 120
- Deployment
- Containerized ASIC infrastructure
This concept illustrates a possible setup. Figures are calculation inputs, not measured customer results. We assess equipment and economics for your site individually.
Related case studies
More project examples

Illustrative cover, not a photograph of the project.
Residential heat reuse
Finland: ASIC heat integration for a 600 m² home
An immersion bath sized for six Antminer L9 transfers heat to a boiler serving a 600 m² home. Owner-reported installation facts, without a claim of measured savings.
- Energy
- Electricity; tariff at installation approximately €0.06/kWh
- On-site installation work was completed in two days, according to the owner. Design, procurement and the complete commissioning schedule are outside that period.
- The owner reports an immersion-loop temperature of up to 55°C. This is not a guaranteed tap-water or heating-delivery temperature.

Wind-energy site
Lithuania Wind-Site Mining Integration
Custom generation-tracking software adjusts the power of 3–4 immersion-cooled miners per turbine as available wind energy changes.
- Energy
- Wind generation and site electricity
- Brought container, cooling and ASIC equipment into one field deployment workflow.
- Validated service access and on-site configuration before ongoing operation.

Solar owner / commercial property
Solar Surplus Mining Project
Compare low-value export with flexible mining and validate the opportunity through a pilot-first model.
- Capacity
- 120 kW
- Miners
- 28
- Energy
- Solar surplus electricity
- Defined a conservative export-versus-mining comparison model.
- Estimated miner count based on surplus power rather than full site capacity.