Planning example: Warehouse Mining Deployment
This is an illustrative planning scenario, not a completed customer project. The site, equipment and figures are assumptions for discussion, not measured results. Any implementation requires a site assessment and an individual technical proposal.
ForMiners modeled a warehouse deployment path with ASIC procurement, rack/layout planning, monitored operation, service access and hosting-style reporting for the owner.

Country
Estonia / EU
Energy source
Grid power with available site capacity
Deployment
Hosted warehouse mining with monitoring
Project frame
Problem and solution
Problem
The site had idle warehouse space and available electrical capacity, but needed a structured approach to miner selection, airflow, monitoring and support before committing to hardware.
Solution
ForMiners modeled a warehouse deployment path with ASIC procurement, rack/layout planning, monitored operation, service access and hosting-style reporting for the owner.
Results
What this planning case demonstrates
- Created a deployment plan for staged miner installation.
- Defined monitoring, service and remote visibility requirements.
- Separated power-cost assumptions from profitability estimates for safer decision-making.
Capacity modeled
250 kW
Seed planning value, not measured production data.
Miner count
60
Illustrative fleet size for layout and monitoring planning.
Service model
Hosted
Monitoring and support workflow included in the concept.
Deployment data
Equipment and operating assumptions
Equipment
- ASIC miner fleet
- Network and power distribution
- Monitoring stack
- Service workflow
Capacity
- Capacity
- 250 kW
- Miners
- 60
- Deployment
- Hosted warehouse mining with monitoring
This concept illustrates a possible setup. Figures are calculation inputs, not measured customer results. We assess equipment and economics for your site individually.
Related case studies
More project examples

Illustrative cover, not a photograph of the project.
Residential heat reuse
Finland: ASIC heat integration for a 600 m² home
An immersion bath sized for six Antminer L9 transfers heat to a boiler serving a 600 m² home. Owner-reported installation facts, without a claim of measured savings.
- Energy
- Electricity; tariff at installation approximately €0.06/kWh
- On-site installation work was completed in two days, according to the owner. Design, procurement and the complete commissioning schedule are outside that period.
- The owner reports an immersion-loop temperature of up to 55°C. This is not a guaranteed tap-water or heating-delivery temperature.

Wind-energy site
Lithuania Wind-Site Mining Integration
Custom generation-tracking software adjusts the power of 3–4 immersion-cooled miners per turbine as available wind energy changes.
- Energy
- Wind generation and site electricity
- Brought container, cooling and ASIC equipment into one field deployment workflow.
- Validated service access and on-site configuration before ongoing operation.

Solar owner / commercial property
Solar Surplus Mining Project
Compare low-value export with flexible mining and validate the opportunity through a pilot-first model.
- Capacity
- 120 kW
- Miners
- 28
- Energy
- Solar surplus electricity
- Defined a conservative export-versus-mining comparison model.
- Estimated miner count based on surplus power rather than full site capacity.